Frame construction is finished and the installation of panels has begun.
Solar panels in the cardboard box are waiting for their turn:
Next, lift the pipe up onto the frame and attach it there. This was a bit of a memorable moment in the history of Oo solar sharing plant: The very first panels were mounted on the frame:
Yesterday, Sept. 19, most panels were already installed:
Next, lift the pipe up onto the frame and attach it there. This was a bit of a memorable moment in the history of Oo solar sharing plant: The very first panels were mounted on the frame:
At this time, our architect Matsuoka-san was there too (in the lower left corner of the picture above, wearing white helmet.)
Finally our place started to resemble a solar sharing project!
The first row of panels was completed the day after the panel installation started.